Q Xu (qxu@gpu.srv.ualberta.ca)
Wed, 24 Mar 1999 19:57:24 -0700 (MST)
Hi Friends,
As GCM is used to predict climate rather than weather, we can use the
initial condition provided by NCAR such as SEP1.T42.0198.nc for any year.
For example, if I want to simulate for the period of 1980-1990, I can take
SEP1.T42.0198.nc as the condition on sept. 1 of 1980. If I want to simulate
for the period of 1990-2000, I can take SEP1.T42.0198.nc as the condition on
sept. 1 of 1990.
Is this concept correct?