b40.1850.lgmco2.track1.1deg.001


Contents:


Run Specifications


===================
General Information
===================

   Purpose of Run: 1850 simulation with LGM CO2 (185 ppm)

   Scientific Lead: Bette Otto-Bliesner

   Software Engineering Lead: nanr

   Assigned to: nanr
 
   Date: 2010-05-18

   Run Length:  1000y
 
=========================
Case Creation Information (all fields are required)
=========================

   CCSM tag:   ccsm4_0_beta54

   Case Name:  b40.1850.lgmco2.track1.1deg.001

   Machine:    jaguarpf

   Compset:    B_1850_CN
 
   Resolution: f09_g16


=============================
Pre-Configuration Information
=============================

   RUN_TYPE = hybrid
   RUN_REFCASE = b40.1850.track1.1deg.006
           
   env_conf.xml mods 
   _________________

        xmlchange -file env_conf.xml -id RUN_STARTDATE -val 0301-01-01
        xmlchange -file env_conf.xml -id RUN_REFDATE -val 0301-01-01
        xmlchange -file env_conf.xml -id CCSM_CO2_PPMV -val 185.0

   env_mach_pes.xml mods - jwolfe
   _____________________

  	component       comp_pes    root_pe   tasks  x threads (stride)
  	---------        ------     -------   ------   ------   ------
  	cpl = cpl        128         240      128    x 1       (1     )
  	glc = sglc       128         0        128    x 1       (1     )
  	lnd = clm        320         160      80     x 4       (1     )
  	ice = cice       640         0        160    x 4       (1     )
  	atm = cam        1984        0        496    x 4       (1     )
  	ocn = pop2       512         496      128    x 4       (1     )
	
  	total pes   : 2496
	


==============================
Post-Configuration Information
==============================

   Buildconf
   _________

   -- clm.buildnml.csh 		urban_hac              = 'OFF'

======================
SourceMods Information
======================

  -- none


==========================
Performance/Cost Estimates
==========================

 	Overall Metrics: 
    	Model Cost:            3669.23   pe-hrs/simulated_year (scale= 1.00) 
    	Model Throughput:        16.33   simulated_years/day 
 
====================
Special Instructions
====================

	Run diagnostics after 10yrs and contact Tom Bettge and Adrianne
	Middleton  to check performance, and liaisons to check results.

	Also ask Tom Bettge about account keys and how long we should run,
	in case we are low on GAU.

	Have Keith Oleson check after 10yrs to be sure urban_wasteheat is ok.

====================
Pre-Run Instructions
====================

  * Run create_production_test
 
  * Run debug smoke test

  * Add NCAR Software Levels info to checklist 

================
Run Instructions
================

  Run Length: 1000y

  Account key:  CLI017DEV

  Priority/Targeted queue:  regular

  Other:

================
Diagnostics Plan
================

  full diagnostics


======================
Additional Information
======================

  * [put any additional information here]


Return to Top


Run Checklist


Complete the following checklist prior to beginning the production run:



1.  Update status file: /web/web-data/cseg/ccsm4_0_runs/b40.1850.lgmco2.track1.1deg.001/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command on bluefire)

	n/a

3.  Complete the following table, as necessary, showing
    the component liaison's name and the date the setup
    was approved.
 

   Component         Liaison/                     Date Approved
                     Reviewer
   ================+==========================+==================

      atm            eaton             		      	20may2010

      cpl            kauff				21may2010

      ice            dbailey                     	20may2010

      lnd            slevis                    		20may2010

      ocn            njn01               		20may2010

      env_ file      [mvertens,other]                 ----
      settings

      data           strand				20may2010
 

4.  Create_production_test completed   [who,when] 

	nanr - jaguarpf - 19may2010
 
5.  Debug smoke test completed [who,when]

	nanr - jaguarpf - 20may2010

6.  Performance review completed [who,when]
 
  total pes active           : 2496 
  pe count for cost estimate : 2496 

  Overall Metrics: 
    Model Cost:            3669.23   pe-hrs/simulated_year (scale= 1.00) 
    Model Throughput:        16.33   simulated_years/day 

Return to Top


Comments

 




Return to Top