b40.1955-2005.2deg.wcm.002


Contents:


Run Specifications


===================
General Information
===================

   Purpose of Run: First in an ensemble of 3 WACCM runs for 1955-2050 from current 20th Century run

   Scientific Lead: marsh

   Software Engineering Lead: fischer

   Assigned to: fischer
 
   Date: 2010-08-05

   Run Length:  50 years
 
=========================
Case Creation Information (all fields are required)
=========================

   CCSM tag:   cesm1_0_beta05

   Case Name:  b40.1955-2005.2deg.wcm.002

   Machine:    bluefire

   Compset:    B_1850-2000_WACCM_CN
 
   Resolution: f19_g16


=============================
Pre-Configuration Information
=============================

   Runtype: hybrid   
           
   RUN_STARTDATE = 1955-01-01
   RUN_REFCASE   = b40.20th.track1.2deg.wcm.007
   RUN_REFDATE   = 1955-01-01

   Specify the following changes in a user_nl_cam:

   &aerodep_flx_nl
    aerodep_flx_file		= 'aerosoldep_rcp4.5_monthly_1849-2104_1.9x2.5_c100402.nc'
    aerodep_flx_type = 'SERIAL'
   /
   &chem_inparm
   flbc_file		= '/fis/cgd/cseg/csm/inputdata/atm/waccm/lb/LBC_1765-2500_1.9x2.5_CMIP5_RCP45_za_c091214.nc'
   solar_parms_file		= '/fis/cgd/cseg/csm/inputdata/atm/waccm/solar/wasolar_1948-2140_daily_c100805.nc'
   spe_data_file		= '/fis/cgd/cseg/csm/inputdata/atm/waccm/solar/spes.1963-2009.c100804.nc'
   /
   &chem_surfvals_nl
    bndtvghg		= '/fis/cgd/cseg/csm/inputdata/atm/cam/ggas/ghg_rcp45_1765-2500_c100405.nc'
   /
   &solar_inparm
   solar_data_file		= '/fis/cgd/cseg/csm/inputdata/atm/cam/solar/spectral_irradiance_Lean_1950-2140_daily_c100804.nc'
   /

   env_conf.xml mods 
   _________________

    < entry id="CLM_NML_USE_CASE"   value="1850-2100_rcp4.5_transient"  / > 



   env_mach_pes.xml mods
   _____________________
      

< entry id="NTASKS_ATM"   value="90"  />
< entry id="NTHRDS_ATM"   value="4"  />
< entry id="ROOTPE_ATM"   value="0"  />

< entry id="NTASKS_LND"   value="10"  />
< entry id="NTHRDS_LND"   value="4"  />
< entry id="ROOTPE_LND"   value="80"  />

< entry id="NTASKS_ICE"   value="80"  />
< entry id="NTHRDS_ICE"   value="4"  />
< entry id="ROOTPE_ICE"   value="0"  />

< entry id="NTASKS_OCN"   value="24"  />
< entry id="NTHRDS_OCN"   value="1"  />
< entry id="ROOTPE_OCN"   value="90"  />

< entry id="NTASKS_CPL"   value="64"  />
< entry id="NTHRDS_CPL"   value="1"  />
< entry id="ROOTPE_CPL"   value="0"  />

< entry id="NTASKS_GLC"   value="64"  />
< entry id="NTHRDS_GLC"   value="1"  />
< entry id="ROOTPE_GLC"   value="0"  />


==============================
Post-Configuration Information
==============================

   Buildconf
   _________

  * [put any special Buildconf directory changes here]


======================
SourceMods Information
======================

  * [put any special SourceMods instructions here]


==========================
Performance/Cost Estimates
==========================

  4 years per day
 
====================
Special Instructions
====================

  * [put any special instructions here]
 

====================
Pre-Run Instructions
====================

  * Run create_production_test
 
  * Run debug smoke test

  * Add NCAR Software Levels info to checklist 

================
Run Instructions
================

  Run Length: 50 years

  Account key:  93300407

  Priority/Targeted queue:  regular

  Other:

================
Diagnostics Plan
================

  * [put diagnostics plan here]


======================
Additional Information
======================

  * [put any additional information here]


Return to Top


Run Checklist


Complete the following checklist prior to beginning the production run:



1.  Update status file: /web/web-data/cseg/ccsm4_0_runs/b40.1955-2005.2deg.wcm.002/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command on bluefire)

***************************************************
NCAR SOFTWARE LEVELS: Fri Aug  6 14:43:40 MDT 2010.
***************************************************


AIX:                  bos.mp              5.3.10.1
CSM:                  csm.core            1.7.1.4
LoadLeveler:          LoadL.full          3.5.1.3
GPFS:                 gpfs.base           3.2.1.14
VSD:                  rsct.vsd.vsdd       4.1.0.23
POE:                  ppe.poe             5.1.1.3
PESSL:                pessl.rte.smp       3.3.0.2
ESSL:                 essl.rte.smp        4.4.0.1
FORTRAN:              xlfrte              12.1.0.7
PERL:                 perl.rte            5.8.2.100
C:                    xlC.rte             10.1.0.3


3.  Complete the following table, as necessary, showing
    the component liaison's name and the date the setup
    was approved.
 

   Component         Liaison/                     Date Approved
                     Reviewer
   ================+==========================+==================

      atm            [hannay,eaton,other]             ----

      cpl            [kauff,mvertens,tcraig,other]    ----

      ice                 dbailey                     ----

      lnd            [erik,slevis]                    ----

      ocn            [njn01,bates,gokhan]             ----

      env_ file      [mvertens,other]                 ----
      settings

      data           [strand,other]                   ----
 

4.  Create_production_test completed   fischer 2010-08-06
 

5.  Debug smoke test completed          fischer 2010-08-06


6.  Performance review completed [who,when]
 


Return to Top


Comments

 




Return to Top