b40.rcp2_6.2deg.001


Contents:


Run Specifications


===================
General Information
===================

   Purpose of Run: CCSM4 CORE 2-degree rcp2.6 run

   Scientific Lead: Jim Hurrell

   Software Engineering Lead: Mariana Vertenstein, Jon Wolfe

   Assigned to: Diane Feddema
 
   Date: 2010-04-20

   Run Length:  96 years

 
=========================
Case Creation Information
=========================

   CCSM tag:   ccsm4_0_beta50

   Case Name:  b40.rcp2_6.2deg.001

   Machine:    bluefire

   Compset:    B_RCP2.6_CN
 
   Resolution: f19_g16


=============================
Pre-Configuration Information
=============================

   Runtype: hybrid
           
   RUN_STARTDATE = 2005-01-01
   RUN_REFCASE   = b40.20th.track1.2deg.001
   RUN_REFDATE   = 2005-01-01


   env_conf.xml mods 
   _________________

   * none


   env_mach_pes.xml mods
   _____________________
      
   component       comp_pes    root_pe   tasks  x threads (stride) 
   ---------        ------     -------   ------   ------   ------  
   cpl = cpl        160         0        160    x 1       (1     ) 
   glc = sglc       1           0        1      x 1       (1     ) 
   lnd = clm        160         0        160    x 1       (1     ) 
   ice = cice       160         0        160    x 1       (1     ) 
   atm = cam        160         0        160    x 1       (1     ) 
   ocn = pop2       96          160      96     x 1       (1     )


==============================
Post-Configuration Information
==============================

   Buildconf
   _________

  * none


======================
SourceMods Information
======================

  * none


==========================
Performance/Cost Estimates
==========================

  * 18.5 years/day across 4 nodes

 
====================
Special Instructions
====================

  * please include Erik Kluzek in the sign-off list
 

====================
Pre-Run Instructions
====================

  * Run create_production_test
 
  * Run debug smoke test

  * Add NCAR Software Levels info to checklist 


================
Run Instructions
================

  Run Length: 96 years

  Account key: 09030617

  Priority/Targeted queue: regular

  Other:


================
Diagnostics Plan
================

  * vs b40.20th.track1.2deg.001 (1986-2005) at 2041-2060 and 2081-2100


======================
Additional Information
======================

  * none


Return to Top


Run Checklist


Complete the following checklist prior to beginning the production run:



1.  Update status file: /web/web-data/cseg/ccsm4_0_runs/b40.rcp2_6.2deg.001/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command on bluefire)

    1.  Update status file:
/web/web-data/cseg/ccsm4_0_runs/b40.rcp2_6.2deg.001/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command
on bluefire)
  
    1.  Update status file:
/web/web-data/cseg/ccsm4_0_runs/b40.rcp2_6.2deg.001/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command
on bluefire)

***************************************************
NCAR SOFTWARE LEVELS: Mon Apr 26 10:19:54 MDT 2010.
***************************************************

AIX:                  bos.mp              5.3.10.1
CSM:                  csm.core            1.7.1.4
LoadLeveler:          LoadL.full          3.5.1.3
GPFS:                 gpfs.base           3.2.1.14
VSD:                  rsct.vsd.vsdd       4.1.0.23
POE:                  ppe.poe             5.1.1.3
PESSL:                pessl.rte.smp       3.3.0.2
ESSL:                 essl.rte.smp        4.4.0.1
FORTRAN:              xlfrte              12.1.0.6
PERL:                 perl.rte            5.8.2.100
C:                    xlC.rte             10.1.0.3



3.  Complete the following table, as necessary, showing
    the component liaison's name and the date the setup
    was approved.
 

   Component         Liaison/                     Date Approved
                     Reviewer
   ================+==========================+==================

      atm            hannay                          4/26/10  10:39 AM            

      cpl            [kauff,mvertens,tcraig,other]    ----

      ice                 dbailey                     4/24/10  7:39 AM 

      lnd            [erik,slevis]                  erik  4/26/10 10:31 AM 

      ocn            [njn01,bates,gokhan]           bates 4/26/10 9:47AM

      env_ file      [mvertens,other]                 ----
      settings

      data           [strand,other]                   ----
 

4.  Create_production_test completed   [dfeddema, 4/23/10 13:54 MT]  
 

5.  Debug smoke test completed [dfeddema, 4/23/10 15:29 MT ]


6.  Performance review completed [who,when]
 


Return to Top


Comments

 




Return to Top