Contents:


Run Specifications


===================
General Information
===================

   Purpose of Run: RCP 4.5 with double black carbon over Asia to gauge the effects of uncertainty in black carbon.

   Scientific Lead: Warren Washington

   Software Engineering Lead: Trey White

   Assigned to: Adrianne Middleton
 
   Date: 2010-10-13

   Run Length:  96 years
 
=========================
Case Creation Information (all fields are required)
=========================

   CCSM tag:   ccsm4_0_beta52

   Case Name:  b40.rcp4_5.bc2x.1deg.002

   Machine:    jaguarpf

   Compset:    B_RCP4.5_CN
 
   Resolution: f09_g16


=============================
Pre-Configuration Information
=============================

   Runtype: hybrid

   RUN_STARTDATE = 2005-01-01
   RUN_REFCASE   = b40.20th.track1.1deg.009
   RUN_REFDATE   = 2005-01-01

   env_conf.xml mods 
   _________________

   * None.


   env_mach_pes.xml mods
   _____________________
      

xmlchange -file env_mach_pes.xml -id NTASKS_ATM -val 384
xmlchange -file env_mach_pes.xml -id NTHRDS_ATM -val 6
xmlchange -file env_mach_pes.xml -id NTASKS_LND -val 64
xmlchange -file env_mach_pes.xml -id NTHRDS_LND -val 6
xmlchange -file env_mach_pes.xml -id NTASKS_ICE -val 320
xmlchange -file env_mach_pes.xml -id NTHRDS_ICE -val 6
xmlchange -file env_mach_pes.xml -id ROOTPE_ICE -val 64
xmlchange -file env_mach_pes.xml -id NTASKS_OCN -val 30
xmlchange -file env_mach_pes.xml -id NTHRDS_OCN -val 6
xmlchange -file env_mach_pes.xml -id ROOTPE_OCN -val 384
xmlchange -file env_mach_pes.xml -id NTASKS_CPL -val 64
xmlchange -file env_mach_pes.xml -id NTASKS_GLC -val 1
xmlchange -file env_mach_pes.xml -id PES_LEVEL -val 3rcm


==============================
Post-Configuration Information
==============================

   Buildconf
   _________

  * cam.buildnml.csh change to
prescribed_aero_datapath = '/tmp/proj/ccsm/runs/ccp/inputdata'
prescribed_aero_file = 'aero_rcp45_fv2_bc2x_1995-2105_c100727.nc'
fincl2 = 'TREFHTMN','TREFHTMX','TREFHT','QREFHT','PRECC','PRECL','PSL'

======================
SourceMods Information
======================

  * None.

==========================
Performance/Cost Estimates
==========================

  * 14 years/day, 2900 core hours/year
 
====================
Special Instructions
====================

  * none
 
====================
Pre-Run Instructions
====================

  * Run create_production_test
 
  * Run debug smoke test

  * Add NCAR Software Levels info to checklist 

================
Run Instructions
================

  Run Length: 96 years

  Account key:  CLI717

  Priority/Targeted queue:  none

  Other:

================
Diagnostics Plan
================

  * Run diagnostics and inform CCP group after 10 years and every 20 years after that.


======================
Additional Information
======================

  * Start from same point as "b40.rcp4_5.1deg.002".
  * Don't do the full liaison checklist. Just Gary for data.


Return to Top


Run Checklist


Complete the following checklist prior to beginning the production run:



1.  Update status file: /web/web-data/cseg/ccsm4_0_runs/b40.rcp4_5.bc2x.1deg.002/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command on bluefire)

3.  Complete the following table, as necessary, showing
    the component liaison's name and the date the setup
    was approved.
 

   Component         Liaison/                     Date Approved
                     Reviewer
   ================+==========================+==================

      atm            [hannay,eaton,other]             ----

      cpl            [kauff,mvertens,tcraig,other]    ----

      ice                 dbailey                     ----

      lnd            [erik,slevis]                    ----

      ocn            [njn01,bates,gokhan]             ----

      env_ file      [mvertens,other]                 ----
      settings

      data           [strand,other]                   ----
 

4.  Create_production_test completed   [who,when] 
 

5.  Debug smoke test completed [who,when]


6.  Performance review completed [who,when]
 


Return to Top