b40.rcp4_5.bc2x.1deg.005


Contents:


Run Specifications


===================
General Information
===================

   Purpose of Run: RCP 4.5 with double black carbon over Asia to gauge the effects of uncertainty in black carbon.

   Scientific Lead: Warren Washington

   Software Engineering Lead: Trey White

   Assigned to: Adrianne Middleton
 
   Date: 2010-07-27

   Run Length:  96 years
 
=========================
Case Creation Information (all fields are required)
=========================

   CCSM tag:   ccsm4_0_beta52

   Case Name:  b40.rcp4_5.bc2x.1deg.005

   Machine:    jaguarpf

   Compset:    B_RCP4.5_CN
 
   Resolution: f09_g16


=============================
Pre-Configuration Information
=============================

   Runtype: hybrid

   RUN_STARTDATE = 2005-01-01
   RUN_REFCASE   = b40.20th.track1.1deg.007 
   RUN_REFDATE   = 2005-01-01

   env_conf.xml mods 
   _________________

   * None.


   env_mach_pes.xml mods
   _____________________
      

xmlchange -file env_mach_pes.xml -id NTASKS_ATM -val 384
xmlchange -file env_mach_pes.xml -id NTHRDS_ATM -val 6
xmlchange -file env_mach_pes.xml -id NTASKS_LND -val 64
xmlchange -file env_mach_pes.xml -id NTHRDS_LND -val 6
xmlchange -file env_mach_pes.xml -id NTASKS_ICE -val 320
xmlchange -file env_mach_pes.xml -id NTHRDS_ICE -val 6
xmlchange -file env_mach_pes.xml -id ROOTPE_ICE -val 64
xmlchange -file env_mach_pes.xml -id NTASKS_OCN -val 30
xmlchange -file env_mach_pes.xml -id NTHRDS_OCN -val 6
xmlchange -file env_mach_pes.xml -id ROOTPE_OCN -val 384
xmlchange -file env_mach_pes.xml -id NTASKS_CPL -val 64
xmlchange -file env_mach_pes.xml -id NTASKS_GLC -val 1
xmlchange -file env_mach_pes.xml -id PES_LEVEL -val 3rcm


==============================
Post-Configuration Information
==============================

   Buildconf
   _________

  * None.


======================
SourceMods Information
======================

  * Create "SourceMods/src.cam/user_nl" with the following content.
&prescribed_aero_nl
prescribed_aero_datapath = '/tmp/proj/ccsm/runs/ccp/inputdata'
prescribed_aero_file = 'aero_rcp45_fv2_bc2x_1995-2105_c100727.nc'
/
cam.buildnml.csh change to
 fincl2         = 'TREFHTMN','TREFHTMX','TREFHT','QREFHT','PRECC','PRECL','PSL'


==========================
Performance/Cost Estimates
==========================

  * 14 years/day, 2900 core hours/year
 
====================
Special Instructions
====================

  * none
 

====================
Pre-Run Instructions
====================

  * Run create_production_test
 
  * Run debug smoke test

  * Add NCAR Software Levels info to checklist 

================
Run Instructions
================

  Run Length: 96 years

  Account key:  CLI717

  Priority/Targeted queue:  none

  Other:

================
Diagnostics Plan
================

  * Run diagnostics and inform CCP group after 10 years and every 20 years after that.


======================
Additional Information
======================

  * Start from same point as "b40.rcp4_5.1deg.005".
  * Don't do the full liaison checklist. Just Gary for data.


Return to Top


Run Checklist


Complete the following checklist prior to beginning the production run:



1.  Update status file: /web/web-data/cseg/ccsm4_0_runs/b40.rcp4_5.bc2x.1deg.005/status.html:
    assigned
    pending
    running
    completed
    stopped

2.  Document NCAR software levels at beginning of run (use the spinfo command on bluefire)
Currently Loaded Modulefiles:
  1) modules/3.1.6
  2) DefApps
  3) torque/2.4.1b1-snap.200905191614
  4) moab/5.3.6
  5) /opt/cray/xt-asyncpe/default/modulefiles/xtpe-istanbul
  6) cray/MySQL/5.0.64-1.0000.2342.16.1
  7) xtpe-target-cnl
  8) xt-service/2.2.41A
  9) xt-os/2.2.41A
 10) xt-boot/2.2.41A
 11) xt-lustre-ss/2.2.41_1.6.5
 12) cray/job/1.5.5-0.1_2.0202.18632.46.1
 13) cray/csa/3.0.0-1_2.0202.18623.63.1
 14) cray/account/1.0.0-2.0202.18612.42.3
 15) cray/projdb/1.0.0-1.0202.18638.45.1
 16) Base-opts/2.2.41A
 17) pgi/10.3.0
 18) xt-libsci/10.4.4
 19) /opt/cray/modulefiles/pmi/1.0-1.0000.7628.10.2.ss
 20) xt-mpt/4.0.0
 21) xt-pe/2.2.41A
 22) xt-asyncpe/3.7
 23) PrgEnv-pgi/2.2.41A
 24) hdf5/1.8.4.1
 25) netcdf/4.0.1.3
 26) nco/3.9.4
 27) ncl/5.0.0
 28) subversion/1.5.0


3.  Complete the following table, as necessary, showing
    the component liaison's name and the date the setup
    was approved.
 

   Component         Liaison/                     Date Approved
                     Reviewer
   ================+==========================+==================

      atm            strand			      7/29/10

      cpl            strand			      7/29/10

      ice            strand                           7/29/10

      lnd            strand                           7/29/10

      ocn            strand                           7/29/10

      env_ file      strand                           7/29/10
      settings

      data           strand                           7/29/10
 

4.  Create_production_test completed   Adrianne 7/28/10
 

5.  Debug smoke test completed Adrianne 7/29/10


6.  Performance review completed [who,when]
 


Return to Top


Comments

 




Return to Top