17 May 2002
http://www.cgd.ucar.edu/csm/experiments/ccsm2.0/index.html
CCSM2 Experiments and Data
The B-Series (active atm, ice, lnd, & ocn)
- b20.007  
CCSM2.0 Control Run (May 2002)
A CCSM2.0 control run has been carried out. The model was run fully
coupled for 370 years in a spin up mode using a pre-release version
of CCSM2.0. The final control run was started at year 350 of this
spin-up run and was run fully coupled. Monthly average
data from all components was saved and some post-processed time series
are available.